Water is produced alongside coalbed methane production and is already gathered and handled across the field.
GridAI produces approximately 14.5 million gallons of fresh, potable-quality water each day as part of normal coalbed methane operations. The water moves through approximately 600 miles of operated water gathering, within a mapped network of approximately 3,100 miles.
At the current reference assumption, a 400 MW liquid-cooled campus would require approximately 4 MGD. Final water demand depends on the cooling design.
| Daily production | 14.5 million gal/d |
| Annual | ~5.3 B gal |
| Quality | Fresh, potable |
| Trend | Grows with gas production |
| 400 MW reference cooling draw | ~4 MGD |
| Gathering network operated | ~600 mi |
| Gathering network mapped | ~3,100 mi |
| Reservoirs and pits | 635 |
| Permitted outfalls | 569 |
| Pump stations | 57 |
The Energy Park sits at approximately 4,500 feet in a semi-arid climate. NOAA normals for Gillette indicate substantial annual hours suitable for economizer operation. Final performance should be modeled against the selected cooling design.
| Mean annual temperature | 45 to 46°F |
| Annual range | 14°F to 87°F |
| Relative humidity | Low, semi-arid |
| Elevation | ~4,500 ft |
Low water use with significant seasonal economizer potential.
The field produces substantially more water than the current 400 MW reference cooling assumption requires. Final treatment and water demand depend on cooling design.
The site can be evaluated for combinations of liquid and air cooling based on rack density and tenant requirements.
The field operates existing water-gathering infrastructure and permitted discharge points. Campus cooling will require project-specific engineering, water chemistry work and any required permit modifications.
Diligence items. Water chemistry against a specific cooling technology, the permit modifications to move volume from current handling into a campus loop, and discharge modeling for the selected design are confirmed in diligence.
Send us the target MW at first energization, ramp schedule, ultimate campus size, target energization date and cooling approach. We will map the generation, gas, water and site plan around it.