Water

14.5 million gallons of water produced every day.

Water is produced alongside coalbed methane production and is already gathered and handled across the field.

14.5M gal/dProduced today
~5.3B galProduced per year
~600 milesOperated water gathering
569Permitted outfalls
Water availability

Produced with the gas.

GridAI produces approximately 14.5 million gallons of fresh, potable-quality water each day as part of normal coalbed methane operations. The water moves through approximately 600 miles of operated water gathering, within a mapped network of approximately 3,100 miles.

At the current reference assumption, a 400 MW liquid-cooled campus would require approximately 4 MGD. Final water demand depends on the cooling design.

Water
Daily production14.5 million gal/d
Annual~5.3 B gal
QualityFresh, potable
TrendGrows with gas production
400 MW reference cooling draw~4 MGD
Gathering network operated~600 mi
Gathering network mapped~3,100 mi
Reservoirs and pits635
Permitted outfalls569
Pump stations57
Climate

A cool, dry climate.

The Energy Park sits at approximately 4,500 feet in a semi-arid climate. NOAA normals for Gillette indicate substantial annual hours suitable for economizer operation. Final performance should be modeled against the selected cooling design.

Climate
Mean annual temperature45 to 46°F
Annual range14°F to 87°F
Relative humidityLow, semi-arid
Elevation~4,500 ft
Cooling

Cooling options.

Air-cooled

Low water use with significant seasonal economizer potential.

Liquid-cooled

The field produces substantially more water than the current 400 MW reference cooling assumption requires. Final treatment and water demand depend on cooling design.

Hybrid

The site can be evaluated for combinations of liquid and air cooling based on rack density and tenant requirements.

Permitting

Existing water infrastructure.

The field operates existing water-gathering infrastructure and permitted discharge points. Campus cooling will require project-specific engineering, water chemistry work and any required permit modifications.

Diligence items. Water chemistry against a specific cooling technology, the permit modifications to move volume from current handling into a campus loop, and discharge modeling for the selected design are confirmed in diligence.

Next step

Start with the load.

Send us the target MW at first energization, ramp schedule, ultimate campus size, target energization date and cooling approach. We will map the generation, gas, water and site plan around it.