Pronghorn Power Campus
Campbell County, Wyoming

Power, land and water for the AI buildout.

GridAI produces 100 MMcf/d of natural gas and 14.5 million gallons of water a day, with two fiber carriers 3.5 miles away. 600 MW of gas is at the wellhead now, with a development path to be a multi-GW campus.

100 MMcf/dProduced today
600 MWOf gas at wellhead now
14.5M gal/dWater produced today
GilletteBuffaloENERGY PARKCampbell County, WyomingBarber Creek 230 kV 1.5 miCarr Draw 230 kV 9.8 miPumpkin Buttes 230 kV 28.5 miInterstate 90Operator substations40 MW sites indicatedCarr Draw – Barber Creek 230 kVBlack Hills Power · 0.75 miBarber Creek – Pumpkin Buttes 230 kVPacifiCorp · 0.99 miDry Willow 40 MW sitePREC 115 kV from Pumpkin ButtesTeckla 230 kVDry Fork 230 kVRegional thermal generationabout 1,300 MW within 25 milesTWO 230 kV CIRCUITS WITHIN A MILECarr Draw to Barber Creek, Black Hills Power, passes0.75 miles from the Energy Park. Barber Creek toPumpkin Buttes, PacifiCorp, passes 0.99 miles. Threesubstations are reachable, on a meshed rather thanradial network, so interconnection does not depend ona single point of delivery. Circuits from HIFLD.GRID CAPACITYApproximately 300 MW is identified at Pumpkin Buttes.Additional capacity at Barber Creek and Carr Draw isdiscussed. Several 40 MW lower-voltage sites areindicated. Grid capacity and timing remain subject toutility studies and written confirmation.020 miN
Drag the map sideways to explore
Energy Park230 kV circuit within one mile230 kV transmission115 kV, Powder River Energy Corporation230 kV substationRegional 230 kV substationOperator substation, 40 MW siteRegional generationInterstate gas pipelineFiber corridor (indicative)Interstate 90GridAI field unitsTown
Regional power access. The Energy Park relative to GridAI’s mapped field units, the 230 kV network, the two circuits that pass within a mile and the three substations reachable from the site. The Powder River Energy Corporation 115 kV circuit runs from Pumpkin Buttes to GridAI’s Dry Willow substation. The shaded boundary is producing field units. The leasehold is larger and is not drawn. Transmission geometry, circuit ownership and substations from HIFLD, pipelines from HIFLD, field units and operator infrastructure from GridAI’s GIS database, August 2026. Fiber corridor is indicative.
Existing infrastructure

An operating energy asset.

3,200Producing gas wells
450 milesGas pipeline
~600 milesOperated water gathering
~1,600 milesElectric distribution mapped
$3.2 billionCAPEX spent on the property
1M acresMineral and surface rights

The Energy Park sits inside GridAI’s existing Powder River Basin operations.

Power

Atoms to bits.

GridAI is developing generation at the Energy Park using natural gas produced from the surrounding field. First power is planned behind the meter and does not rely on a large-load grid interconnection.

GridAI gas

→

On-site generation

→

Data center

Today600 MWOf gas at wellhead now

At a 9,500 Btu/kWh reference heat rate, 600 MW of continuous generation requires approximately 137 MMcf/d of gas. GridAI produces 100 MMcf/d today.

The site

The Energy Park.

Gas

100 MMcf/d produced today

3,200 producing gas wells and 450 miles of pipeline.

Power

600 MW of gas at wellhead in 2026.

Behind-the-meter generation using GridAI gas.

Land

Site control in place today

GridAI controls the Energy Park site through existing surface use agreements. Further land arrangements are in progress.

Water

14.5 million gallons a day

Produced today and handled through the field water system.

Fiber

Two carriers 3.5 miles away

Dedicated high-capacity campus fiber still needs to be built.

Grid

230 kV substation 1.5 miles away

Additional grid access is under development and is not required for the planned behind-the-meter first-power configuration.

Scale

A path to gigawatt scale.

GridAI reports 3P reserves of 1.9 Tcf, evaluated by Netherland, Sewell & Associates under SPE-PRMS with an effective date of 30 June 2025. Current production of 100 MMcf/d supports approximately 400 MW at the reference heat rate. The 600 MW target, and growth beyond it, requires additional field development through returning wells to production, recompletions and new drilling.

Today
100 MMcf/d gas production
2026
600 MW of gas at wellhead
Long term
Multi-GW campus
Energy Park map

Pronghorn Power Campus

Campbell County, Wyoming
44.17979 N, 105.86604 W

Range / ACTVisionary BroadbandBarber Creek 230 kV1.5 miWestern Midstream / Fort Union headers1.5 mi, gas out or gas inENERGY PARKCentralized gas and water44.17979 N, 105.86604 WFIBER: TWO CARRIERSRange / ACT and Visionary Broadband both run theInterstate 90 corridor, 3.5 miles north of the Energy Park.GAS: TWO EXTERNAL ROUTESWestern Midstream (Bighorn) and Fort Union Gas Gatheringmeet 1.5 miles from the Energy Park. Either system cantake gas away or bring gas in.WATER: PRODUCED WITH THE GAS14.5 million gal a day of fresh water is produced withthe gas and gathered through the existing field waternetwork.03 miN
Drag the map sideways to explore
Energy Park, centralized gas and waterHeader interconnectWestern Midstream headerFort Union Gas GatheringBarber Creek 230 kV substation230 kV transmissionFiber: Range / ACT and VisionaryOperator yardGridAI field unitsInterstate 90
Energy Park detail. Gas and water are centralized at the Energy Park. Western Midstream’s Bighorn system and Fort Union Gas Gathering meet 1.5 miles away. The Barber Creek 230 kV substation is 1.5 miles. Two carriers run the Interstate 90 corridor 3.5 miles north. Geometry from GridAI’s GIS database, August 2026, and HIFLD. Fiber corridors are indicative alignments.
1.5 miBarber Creek 230 kV substation
1.5 miWestern Midstream / Fort Union gas infrastructure
2.8 miGridAI gas and water gathering
3.5 miInterstate 90
3.5 miInterstate 90 fiber corridor
25 miGillette
Market context

Power is getting harder to find.

ERCOT is tracking approximately 474 GW of large-load interconnection requests. About 90% are data centers. ERCOT’s all-time peak demand is 91.1 GW, set on 22 July 2026, against a normal range of 40 to 80 GW. The queue is about five times the largest load the grid has ever served.

GridAI’s first-power plan is different. Generation is developed on site using gas produced from the field.

474 GWERCOT large-load requests
91.1 GWERCOT all-time peak, 22 July 2026
~90%Data centers

Source: ERCOT, July 2026. Peak load per EIA.

Sources. Operator data: GridAI operator GIS database, August 2026, and operator-reported production. Transmission, substations and gas pipelines: HIFLD. Generation inventory: EIA-860. Carrier facilities and autonomous system numbers: PeeringDB. Climate: NOAA 1991 to 2020 normals. Tax provisions: Wyoming Business Council, W.S. §39-15-105 and §39-16-105. ERCOT large-load interconnection queue volume: ERCOT, July 2026. ERCOT all-time peak hourly load and normal operating range: ERCOT hourly load data; peak of 91.1 GW on 22 July 2026 as reported by the U.S. Energy Information Administration.

Basis of presentation. Volumes are operator-reported and are produced today unless labeled otherwise. Generation capacity and dates are targeted and reflect GridAI’s current development plan, subject to field development, equipment delivery, permitting and the timing of a signed offtake. The Energy Park site is controlled through existing surface use agreements, and further land arrangements are in progress and confirmed in diligence. Grid capacity and timing are indicated by Powder River Energy Corporation and Basin Electric Power Cooperative and remain subject to utility studies and written confirmation. Carbon capture and additional generation technologies are under evaluation. Distances are straight-line from the Energy Park coordinate. Fiber corridors are indicative alignments along Interstate 90 and are not surveyed cable routes. Nothing on this site constitutes an offer, a commitment, or a reserve report. Reserves are as reported by Netherland, Sewell & Associates under SPE-PRMS with an effective date of 30 June 2025; 3P is the least certain category and proved reserves are a small fraction of it. Gathering and distribution mileage described as mapped is drawn geometry from the operator GIS and includes lines that are not in service.

Next step

Start with the load.

Send us the target MW at first energization, ramp schedule, ultimate campus size, target energization date and cooling approach. We will map the generation, gas, water and site plan around it.

Stay Updated