Campbell County, Wyoming · 44.17979 N, 105.86604 W
Gas, water, electric infrastructure, transmission and fiber are all within a few miles of the Energy Park.
The Energy Park sits inside GridAI’s operating Powder River Basin field. Roads, gas gathering, water handling, electric distribution and field operations are already in use across the surrounding property.
| Barber Creek 230 kV substation | 1.5 mi |
| Western Midstream / Fort Union headers | 1.5 mi |
| Deadhorse interconnect | 1.2 mi |
| Barber Creek operating yard | 1.3 mi |
| Bison Pipeline | 2.4 mi |
| GridAI gas and water gathering | 2.8 mi |
| Interstate 90 fiber corridor | 3.5 mi |
| Carr Draw 230 kV substation | 9.8 mi |
| Gillette | 25 mi |
| Pumpkin Buttes 230 kV substation | 28.5 mi |
| Mineral and surface rights | ~1,000,000 acres |
| Held by production | All leases |
| Owned acreage | 1,200+ acres |
| Operated wells | 5,200+ |
| Producing wells | 3,200 |
| Gas production | 100 MMcf/d |
| Water production | 14.5 million gal/d |
| Gas pipeline | 450 mi |
| Water gathering operated | ~600 mi |
| Water gathering mapped | ~3,100 mi |
| Electric distribution mapped | ~1,600 mi |
| Operator substations | 5 |
| Operator fiber | 10.4 mi |
To be confirmed in diligence. The final campus footprint, acreage, land control and surface access are subject to survey and to confirmation of surface and mineral estate status at the selected parcel.
Every layer on this page as a Google Earth file: the Energy Park, the 230 kV mesh and the three substations reachable from it, both gas headers, the water network, both fiber corridors and the asset footprint. Each feature carries its own detail panel. The dense field layers are included and switched off by default.
GridAI controls the Energy Park site through existing surface use agreements and can access and use the land today. Further land arrangements, including purchase, are in progress. Existing field infrastructure and easements provide routes for gas, water and electric infrastructure across the surrounding operations.
Separately, GridAI owns more than 1,200 acres elsewhere within the field, available for development.
Final site acreage, the land-control structure and the campus footprint are confirmed in diligence, alongside survey and geotechnical work at the selected parcel.
| Seismic | Very low |
| Hurricane or tropical | None |
| Wildfire | Low, grassland |
| Flood | Off floodplain |
| Elevation | ~4,500 ft |
| Mean annual temperature | 45 to 46°F |
| Annual range | 14°F to 87°F |
| Relative humidity | Low, semi-arid |
Interstate 90 is the regional heavy-haul route serving the Powder River Basin’s mines, gas fields and power plants.
Send us the target MW at first energization, ramp schedule, ultimate campus size, target energization date and cooling approach. We will map the generation, gas, water and site plan around it.