The Energy Park

Inside an operating energy field.

Campbell County, Wyoming · 44.17979 N, 105.86604 W

Gas, water, electric infrastructure, transmission and fiber are all within a few miles of the Energy Park.

Existing infrastructure

Existing infrastructure.

The Energy Park sits inside GridAI’s operating Powder River Basin field. Roads, gas gathering, water handling, electric distribution and field operations are already in use across the surrounding property.

Distances from the site coordinate
Barber Creek 230 kV substation1.5 mi
Western Midstream / Fort Union headers1.5 mi
Deadhorse interconnect1.2 mi
Barber Creek operating yard1.3 mi
Bison Pipeline2.4 mi
GridAI gas and water gathering2.8 mi
Interstate 90 fiber corridor3.5 mi
Carr Draw 230 kV substation9.8 mi
Gillette25 mi
Pumpkin Buttes 230 kV substation28.5 mi
The operating asset

The operating asset.

Mineral and surface rights~1,000,000 acres
Held by productionAll leases
Owned acreage1,200+ acres
Operated wells5,200+
Producing wells3,200
Gas production100 MMcf/d
Water production14.5 million gal/d
Gas pipeline450 mi
Water gathering operated~600 mi
Water gathering mapped~3,100 mi
Electric distribution mapped~1,600 mi
Operator substations5
Operator fiber10.4 mi

To be confirmed in diligence. The final campus footprint, acreage, land control and surface access are subject to survey and to confirmation of surface and mineral estate status at the selected parcel.

Site detail

The Energy Park and surrounding infrastructure.

Range / ACTVisionary BroadbandBarber Creek 230 kV1.5 miWestern Midstream / Fort Union headers1.5 mi, gas out or gas inENERGY PARKCentralized gas and water44.17979 N, 105.86604 WFIBER: TWO CARRIERSRange / ACT and Visionary Broadband both run theInterstate 90 corridor, 3.5 miles north of the Energy Park.GAS: TWO EXTERNAL ROUTESWestern Midstream (Bighorn) and Fort Union Gas Gatheringmeet 1.5 miles from the Energy Park. Either system cantake gas away or bring gas in.WATER: PRODUCED WITH THE GAS14.5 million gal a day of fresh water is produced withthe gas and gathered through the existing field waternetwork.03 miN
Drag the map sideways to explore
Energy Park, centralized gas and waterHeader interconnectWestern Midstream headerFort Union Gas GatheringBarber Creek 230 kV substation230 kV transmissionFiber: Range / ACT and VisionaryOperator yardGridAI field unitsInterstate 90
Energy Park detail. Gas and water are centralized at the Energy Park. Western Midstream’s Bighorn system and Fort Union Gas Gathering meet 1.5 miles away. The Barber Creek 230 kV substation is 1.5 miles. Two carriers run the Interstate 90 corridor 3.5 miles north. Geometry from GridAI’s GIS database, August 2026, and HIFLD. Fiber corridors are indicative alignments.

Google Earth package

Every layer on this page as a Google Earth file: the Energy Park, the 230 kV mesh and the three substations reachable from it, both gas headers, the water network, both fiber corridors and the asset footprint. Each feature carries its own detail panel. The dense field layers are included and switched off by default.

Format KMZ · Google Earth Size 0.9 MB Layers 8 groups Data Operator GIS, Aug 2026 · HIFLD · EIA-860
Download KMZ Opens in Google Earth
Pro or Web
Land

Site control.

GridAI controls the Energy Park site through existing surface use agreements and can access and use the land today. Further land arrangements, including purchase, are in progress. Existing field infrastructure and easements provide routes for gas, water and electric infrastructure across the surrounding operations.

Separately, GridAI owns more than 1,200 acres elsewhere within the field, available for development.

Final site acreage, the land-control structure and the campus footprint are confirmed in diligence, alongside survey and geotechnical work at the selected parcel.

Physical risk and climate
SeismicVery low
Hurricane or tropicalNone
WildfireLow, grassland
FloodOff floodplain
Elevation~4,500 ft
Mean annual temperature45 to 46°F
Annual range14°F to 87°F
Relative humidityLow, semi-arid
Access

3.5 miles from Interstate 90.

3.5 miTo Interstate 90
27 miGillette and Campbell County Airport
70 miSheridan County Airport
~5 hrDrive to Denver International

Interstate 90 is the regional heavy-haul route serving the Powder River Basin’s mines, gas fields and power plants.

Next step

Start with the load.

Send us the target MW at first energization, ramp schedule, ultimate campus size, target energization date and cooling approach. We will map the generation, gas, water and site plan around it.

Stay Updated