GridAI operates 3,200 producing coalbed methane wells across its Powder River Basin leasehold. Gas for the Energy Park comes from the same field.
Gas used at the Energy Park can be supplied from GridAI production before entering the third-party gathering and treating system.
Each Mcf used on site avoids approximately $0.55 of gathering and compression cost and approximately $0.20 to $0.36 of treating cost under the current field cost structure.
| Current production | 100 MMcf/d |
| Producing wells | 3,200 |
| Gas pipeline | 450 miles |
| Third-party primary fuel contract | Not required |
| Firm transport reservation for primary supply | Not required |
| Gas type | Coalbed methane |
Third-party gathering systems meet near the Energy Park and provide additional routes for gas sales and potential supplemental supply.
A gathering header reaching the Energy Park from the north.
A second header reaching the same point from the southeast.
Interstate access, with the Bison Pipeline 2.4 miles from the site. Kinder Morgan operates gas treatment and gathering across the basin.
Regulatory classification. Fuel moving from GridAI wells to GridAI on-site generation across the GridAI leasehold does not implicate FERC-jurisdictional interstate transportation. Supplemental third-party gas, if elected, runs through the existing headers under the normal midstream framework. Both structures should be confirmed with counsel against the final commercial form.
GridAI reports 3P reserves of 1.9 Tcf, evaluated by Netherland, Sewell & Associates under SPE-PRMS with an effective date of 30 June 2025. Current production of 100 MMcf/d supports approximately 400 MW at the reference heat rate. The 600 MW target, and growth beyond it, requires additional production from the existing field development inventory.
Fuel for the Energy Park comes from GridAI production rather than a third-party gas purchase. Power pricing can be structured around the resulting fuel cost and project requirements.
Pricing, tenor and escalation are commercial terms provided directly to counterparties.
Send us the target MW at first energization, ramp schedule, ultimate campus size, target energization date and cooling approach. We will map the generation, gas, water and site plan around it.