Diligence

Site diligence.

Current status of the Energy Park across power, fuel, water, land, connectivity, permitting and commercial structure. Items marked In Progress or Diligence require additional work or counterparty confirmation.

Answered

In place today and verifiable now

In progress

Underway, with a defined path

Diligence

Requires survey, counsel or a counterparty input

6 sections

Power, fuel, water, site, regulatory, counterparty

1  ·  Power and generation
Grid interconnection: queue position, study status, energization timeline
The planned behind-the-meter configuration does not rely on a large-load grid interconnection, so there is no queue position and no interconnection study to report. Separately, several 40 MW lower-voltage sites are indicated, approximately 300 MW is identified at Pumpkin Buttes, and additional capacity is discussed at Barber Creek and Carr Draw. Grid capacity and timing remain subject to utility studies and written confirmation.In progress
Available capacity: substation headroom, transmission constraints, network upgrades
Three 230 kV substations are reachable from the Energy Park: Barber Creek at 1.5 miles, Carr Draw at 9.8 miles and Pumpkin Buttes at 28.5 miles, on a meshed rather than radial network. For the planned first-power configuration the question does not arise. Campus load is served on site, so there is no headroom constraint and no network upgrade allocation.Answered
Behind-the-meter feasibility: on-site gas, storage, hybrid
This is the planned design. 600 MW of gas is at the wellhead in 2026. Generation is modular reciprocating units fueled from current production. Battery storage can be layered for ramp-rate and transient support. Firmness does not require it, because the fuel is continuous.In progress
Generation equipment lead times, usually the longest item
Kodiak Power Solutions is GridAI’s contracted generation partner. Modular reciprocating generation is planned against 600 MW of gas at the wellhead in 2026. Unit configuration, equipment schedule and delivery slots are shared under NDA.In progress
Redundancy and reliability: N+1 or 2N design, backup power
Modular block architecture means an individual reciprocating unit represents a small share of total campus capacity. Generation can be designed around the customer’s uptime requirement. Final redundancy design follows the load profile and the uptime commitment.Diligence
Who operates the generation
Kodiak Power Solutions is GridAI’s contracted generation partner and operates and maintains the generation equipment. GridAI supplies fuel, water, land and field support. The final equipment ownership structure and commercial terms are confirmed in diligence.In progress
Emissions permitting: air permits, state environmental review
Air permitting is being sequenced with the generation build. Current status, emissions assumptions and permitting work are available through project diligence. Air permitting runs through the Wyoming DEQ Air Quality Division, and the operator holds air permits across the field today.In progress
2  ·  Fuel supply
Proximity to pipeline, and available capacity on it
GridAI produces 100 MMcf/d today across 3,200 producing wells and operates 450 miles of pipeline. Fuel for the Energy Park can be supplied from this production. Separately, two third-party headers, Western Midstream’s Bighorn system and Fort Union Gas Gathering, meet 1.5 miles from the Energy Park, so gas can be sold out or brought in.Answered
Interconnection feasibility: lateral cost and timeline
A fuel lateral is required and the scope is specific. The nearest GridAI gathering line is 2.8 miles from the site coordinate, the two third-party headers are 1.5 miles, and the Deadhorse interconnect is 1.2 miles. This is a short in-field tie across ground GridAI already holds easements over and builds pipe on routinely. Route, cost and timeline are provided under NDA.In progress
Gas supply reliability: basin depth, curtailment and force majeure history
Coalbed methane: shallow, unstimulated, long-lived wells with a flat decline profile. Gas is flowing today. Fuel for the Energy Park comes from GridAI production rather than a third-party purchase, so there is no third-party curtailment or force majeure counterparty in the primary fuel path.Answered
Reserves and long-term supply
GridAI reports 3P reserves of 1.9 Tcf, evaluated by Netherland, Sewell & Associates under SPE-PRMS with an effective date of 30 June 2025. Current production of 100 MMcf/d supports approximately 400 MW at the reference heat rate. The 600 MW target, and growth beyond it, requires additional field development through return-to-production work, recompletions and new drilling. The reserve report and field development plan are available under NDA.In progress
Commodity strategy: fixed against index, hedging, marketer requirement
Fuel for the Energy Park comes from GridAI production rather than a third-party gas purchase. Power pricing can be structured around the resulting fuel cost and project requirements. No third-party gas marketer is required for primary supply.Answered
Regulatory classification: FERC against state, permitting pathway
Gas moving from GridAI wells to GridAI on-site generation across the GridAI leasehold does not implicate FERC-jurisdictional interstate transportation. Supplemental third-party gas, if elected, runs through the existing headers under the normal midstream framework. The final structure should be confirmed with counsel.Diligence
Carbon and ESG: offsets, sustainability commitments
The gas is biogenic and produced without stimulation, which gives a low carbon intensity score. GridAI is evaluating carbon capture and sequestration at the Energy Park. Geology, project design, tax-credit structure and permitting remain under evaluation. Injection permitting has not commenced.In progress
3  ·  Water
Availability: water rights, aquifer capacity, municipal supply against demand
14.5 million gallons a day of fresh, potable-quality water is handled through the existing field water system. It moves through approximately 600 miles of operated water gathering, within a mapped network of approximately 3,100 miles, into 635 reservoirs and pits and 569 permitted outfalls. The proposed cooling supply comes from water produced through GridAI’s gas operations and does not rely on municipal water.Answered
Cooling technology fit and resulting water intensity
All three designs can be evaluated. Air-cooled uses low water with significant seasonal economizer potential. For liquid cooling, the field produces substantially more water than the current 400 MW reference cooling assumption requires. Hybrid sets the split by rack density. Final treatment requirements and water demand depend on the selected cooling design.Answered
Permitting: withdrawal permits, discharge
The field operates existing water-gathering infrastructure and 569 permitted discharge points under the Wyoming DEQ framework today. Campus cooling will require project-specific engineering, water chemistry work and any required permit modifications.Diligence
Drought and regulatory risk: water stress, moratorium risk
The proposed cooling supply comes from water produced through GridAI’s gas operations and does not rely on municipal water. Final treatment requirements, water demand and permitting depend on the selected cooling design.Answered
Wastewater and discharge infrastructure, on-site treatment
Treatment facilities operate across the field, with 57 pump stations. Water chemistry against a specific cooling technology, blowdown handling and discharge modeling are worked with the counterparty’s design engineer.Diligence
4  ·  Site and land
Land control: ownership, lease terms, easements for pipeline and transmission
GridAI controls the Energy Park site through existing surface use agreements and can access and use the land today. Further land arrangements, including purchase, are in progress. Separately, GridAI owns more than 1,200 acres elsewhere within the field, available for development, and holds approximately 1,000,000 acres of mineral and surface rights, with all leases held by production. Easements for gas, water and power routing already exist across the field. Final site acreage, the land-control structure and any additional surface rights required are confirmed in diligence.Diligence
Zoning and entitlements, setback requirements
The site lies in unincorporated Campbell County territory with no zoning overlay and no residential setback conflict. Surrounding land use is wells, compression and coal. The county has permitted industrial energy development continuously for four decades.Answered
Environmental review: Phase I and II ESA, wetlands, species, cultural resources
Not yet commissioned for the campus parcel. These are standard pre-construction studies and would run against the selected footprint. The field has a four-decade permitting record in the same formations and surface, which is useful precedent and not a substitute for a parcel-specific assessment.Diligence
Geotechnical: soil conditions for foundations and pipeline construction
Not yet performed for the campus parcel. Foundations and buried infrastructure have been constructed continuously across this field, so regional soil behavior is well characterized in operator experience. A parcel-specific investigation follows footprint selection.Diligence
Survey and final footprint
The final campus footprint, acreage and surface access are subject to survey and to confirmation of surface and mineral estate status at the selected parcel.Diligence
Physical hazard profile
Seismic very low, no tropical exposure, low grassland wildfire risk, off floodplain, elevation about 4,500 feet. Heavy-haul access from Interstate 90 is 3.5 miles and already carries turbine- and mine-scale loads.Answered
Connectivity at the site
Two carriers on the Interstate 90 corridor 3.5 miles north, three carrier-neutral facilities within 70 miles, and 10.4 miles of operator fiber in service for field telemetry and control. The item that needs a build: Wyoming long-haul routes commonly cap near 144 strands against a hyperscale requirement of 864 to 1,728. Closing that gap takes a purpose-built lateral and a high-strand-count corridor build, with Wyoming’s Broadband Development Program (W.S. §9-12-1501) and the Wyoming Broadband Office as the public-private funding route.In progress
5  ·  Regulatory and community risk
Moratorium risk: state or local restrictions, pending legislation
No moratorium enacted or proposed in Wyoming. Wyoming policy is increasingly focused on how large data centers affect power supply, water, existing customers and host communities, and a Public Service Commission rulemaking on non-utility generation is active. The Energy Park is being developed around on-site generation and water already produced through the surrounding gas operations.Answered
Self-supply and behind-the-meter regulatory treatment
Wyoming utility statutes reach service offered “to or for the public” (W.S. §37-1-101), and Wyoming authority has held that sales to a single purchaser or a small number of identified industrial customers fall outside that definition. Open items, stated plainly: the landlord and tenant variant is untested at data center scale; in July 2026 the Commission declined a declaratory petition on co-located third-party sales as hypothetically posed, leaving the point undecided; the non-utility generation rulemaking is active; and incumbent utilities may object to a given structure. The final commercial and ownership structure will be confirmed against applicable Commission rules and project-specific legal advice.Diligence
Community and stakeholder sentiment, public hearing requirements
Campbell County has a long history of coal, natural gas and power development. Approximately 1,300 MW of thermal generation currently operates within about 25 miles of the Energy Park. Project-specific public and regulatory processes will still apply.Answered
Tax incentives: abatements, PILOT, economic development packages
0% corporate income tax, 0% personal income tax and 0% gross receipts tax. Wyoming provides statutory sales and use tax exemptions for qualifying data center equipment under W.S. §39-15-105 and §39-16-105, subject to capital investment, annual purchase and certification requirements. Current-year qualification requirements should be confirmed with the Wyoming Business Council and project tax counsel.Answered
Permitting timeline: air, water, construction sequencing
Air through Wyoming DEQ Air Quality, water through DEQ and the State Engineer, construction through the county. Air permitting is being sequenced with the generation build. Current status by permit is shared under NDA.In progress
6  ·  Counterparty and structure
Who is on the other side of the table
GridAI, the operator of the field. More than 5,200 operated wells, 3,200 producing, about $3.2 billion of CAPEX spent on field infrastructure, and a field team running the asset daily from an office in Sheridan, Wyoming.Answered
Developer track record and balance sheet strength
Day-to-day operations are run by Keith Knapstad, forty-plus years in the Powder River Basin at Marathon, J.M. Huber, Evergreen and Nytis. Power delivery is led by Landon Lonsberry, whose prior work as a project engineer and project manager includes the Line 3 Replacement Project, Trans Mountain, and the Carbon TerraVault Elk Hills and YEG hydrogen facilities. Financial statements and reserve information are provided under NDA.Answered
Capital structure and funding of the generation build
Kodiak Power Solutions is GridAI’s contracted generation partner and operates and maintains the generation equipment. The final equipment ownership structure, capital structure and commercial terms are confirmed in diligence.In progress
Contract structure: construction and timing risk, termination
Addressed in a term sheet covering power, land and fuel together, with capacity, tenure, pricing basis and a milestone schedule. Capacity lands in blocks as load arrives, so timing risk is sized to a block instead of a whole plant.Diligence
What we need from a data center partner
Target MW at first energization, ramp schedule, ultimate campus size, target energization date, cooling design and connectivity requirements. GridAI uses those inputs to develop the generation, field development, water and site plan.Answered

Sources. Operator data: GridAI operator GIS database, August 2026, and operator-reported production. Transmission, substations and gas pipelines: HIFLD. Generation inventory: EIA-860. Carrier facilities and autonomous system numbers: PeeringDB. Climate: NOAA 1991 to 2020 normals. Tax provisions: Wyoming Business Council, W.S. §39-15-105 and §39-16-105. ERCOT large-load interconnection queue volume: ERCOT, July 2026. ERCOT all-time peak hourly load and normal operating range: ERCOT hourly load data; peak of 91.1 GW on 22 July 2026 as reported by the U.S. Energy Information Administration.

Basis of presentation. Volumes are operator-reported and are produced today unless labeled otherwise. Generation capacity and dates are targeted and reflect GridAI’s current development plan, subject to field development, equipment delivery, permitting and the timing of a signed offtake. The Energy Park site is controlled through existing surface use agreements, and further land arrangements are in progress and confirmed in diligence. Grid capacity and timing are indicated by Powder River Energy Corporation and Basin Electric Power Cooperative and remain subject to utility studies and written confirmation. Carbon capture and additional generation technologies are under evaluation. Distances are straight-line from the Energy Park coordinate. Fiber corridors are indicative alignments along Interstate 90 and are not surveyed cable routes. Nothing on this site constitutes an offer, a commitment, or a reserve report. Reserves are as reported by Netherland, Sewell & Associates under SPE-PRMS with an effective date of 30 June 2025; 3P is the least certain category and proved reserves are a small fraction of it. Gathering and distribution mileage described as mapped is drawn geometry from the operator GIS and includes lines that are not in service.

Under non-disclosure

Available under NDA.

Commercial and technical materials are available following execution of a mutual NDA.

Commercial

Power pricing, generation agreements, capital structure, term and escalation.

Technical

Reserve report, field development plan, generation specifications, equipment schedule, permitting status, water information and detailed GIS data.

Site visit

Energy Park, Barber Creek operating yard, gas infrastructure and field operations.

Google Earth package available

The infrastructure platform as a Google Earth file: Energy Park, 230 kV mesh and substation distances, gas headers, water network, fiber corridors and asset footprint, each with its own detail panel. Field-level layers for wells, laterals, electric distribution and water storage are included and switched off by default.

Format KMZ · Google Earth Size 0.9 MB Layers 8 groups Data Operator GIS, Aug 2026 · HIFLD · EIA-860
Download KMZ Opens in Google Earth
Pro or Web
Next step

Start with the load.

Send us the target MW at first energization, ramp schedule, ultimate campus size, target energization date and cooling approach. We will map the generation, gas, water and site plan around it.