One company.
The entire stack.
One meter.
The GridAI model turns owned fuel into firm power today, with a pathway to nuclear baseload, creating a fully integrated stack: land, gas, pipeline, water, fiber, and power — all behind one meter.
Six layers. One owner.
Everything a hyperscale campus needs to turn on is part of the same operating asset in Wyoming’s Powder River Basin. Pick a layer.
Own the fuel. Make the power. Feed the AI.
GridAI turns its producing Wyoming gas into firm power, aiming to add EAGL-1 nuclear baseload next, and sells 24/7 behind-the-meter power to hyperscale AI data centers.
Gas already flowing
3,200 producing gas wells and 450 miles of owned pipeline. Fuel at cost, with no third-party primary fuel contract required.
Generation at the wellhead
Modular gas-fired generation fueled by GridAI’s own production, built for behind-the-meter service to the Energy Park.
Campuses plug in
Hyperscale AI campuses connect behind the meter: firm 24/7 power, with no reliance on a large-load grid queue for first power.
Baseload next
Substantial upside through EAGL-1 nuclear baseload: a 1.4 GW cluster of six units, deployed on ground GridAI already owns.
Power is the constraint. Integration removes it.
Most data center power is assembled from separate owners: a landowner, a gas marketer, a pipeline, a utility and a queue. Here it is one platform.
Assembled from parts
The usual route to a powered site
- Wait for grid capacityERCOT alone is tracking about 474 GW of large-load requests against a 91.1 GW all-time peak.
- Buy fuel from someone elseA supply contract, plus gathering, treating and transport charges on every unit.
- Find land, water and fiber separatelyEach with its own owner, timeline and negotiation.
Behind one meter
The GridAI platform
- Behind-the-meter generation on its own gasNo reliance on a large-load grid queue for first power.
- Fuel produced by GridAIEach Mcf used on site avoids about $0.55 of gathering and compression and $0.20 to $0.36 of treating cost.
- Land, water and fiber already at the siteAbout 1 million acres of rights, 14.5 million gallons of water a day, two fiber carriers 3.5 miles away.
From gas today to nuclear baseload.
Firm power starts with the gas the field already produces and scales with field development. Nuclear is the next layer on the same ground.
100 MMcf/d of production covers approximately 400 MW at the reference heat rate.
Modular reciprocating generation, with Kodiak Power Solutions as the contracted generation partner.
Six EAGL-1 lead-bismuth fast reactors at 240 MWe each, through the FANCO joint venture.
A multi-GW campus. Generation above 600 MW requires additional gas production from the existing field development inventory.
Bars are illustrative and not to scale. Volumes are operator-reported and are produced today unless labeled otherwise. Generation capacity and dates are targeted and reflect GridAI’s current development plan, subject to field development, equipment delivery, permitting and the timing of a signed offtake. Reserves are as reported by Netherland, Sewell & Associates under SPE-PRMS with an effective date of 30 June 2025; 3P is the least certain category and proved reserves are a small fraction of it. Nothing on this site constitutes an offer, a commitment, or a reserve report.